EIA, GSM, and Pasture Permit procedures are being coordinated with the Sivas Provincial Directorate of Environment.
Читать далее →
Strategic metals were verified in analyses conducted at the Istanbul University Cerrahpaşa PROTEK laboratory.
Читать далее →
A Phase 1 program of 20 core drillings at a depth of 150 m has been prepared.
Читать далее →