FOR SALE 1,950 ha Polymetallic Exploration Licence — Sivas Details →
TR TR EN EN DE DE RU RU AR AR

In accordance with Article 7 of the Mining Law, applications for all necessary permits (EIA, GSM, and Pasture Permit) have been submitted to the relevant institutions, and the application process is ongoing for the 25-hectare surface operating area within the scope of Annex-2 of the EIA Regulation.

← All News