Located in one of Turkey's most promising metallogenic provinces, Sivas Suşehri Elmaseki-Kiziryurdu licence area is open for transfer, partnership or strategic investment. Licence transfer is subject to MAPEG regulatory approval.
Located in the southern zone of the Eastern Pontide Tectonic Belt, this site sits in one of Anatolia's most productive metallogenic provinces for hydrothermal mineralization.
Not just gold — 18 detected metallic, strategic and trace elements including Au, Ag, Pt, Pd, Ir, Cu, Ti, Zn, Tl and La, Yb, Eu, Sc, Ba, Sr, Zr, Te, Be have been reported in XRF Omnian, MTA, and PROTEK laboratory analyses.
Tested under TÜRKAK-accredited ISO 17025 standards at ARGETEST (AB-0742-T), the MTA General Directorate (AB-0394-T), and Istanbul University Cerrahpaşa PROTEK laboratories.
Surrounded on three sides by the exploration licences of Koza Gold (E/N), Unitek Mining (W) and Göktekin Energy (S), verifiable through MAPEG public licence records — a supportive indicator of regional mineralisation. Adjacent licence activity is not evidence of mineralisation on the Sırataş site itself.
Selected concentrate samples reported: 93.5 mg/kg Au · 205,260 mg/kg Ag · 11.14 mg/kg Pt · 21.97% Cu · 0.685 mg/kg Ir.
These results indicate multi-metal exploration potential that requires evaluation via advanced geological studies, geophysical surveys and drilling programmes.
Important Technical Note: These values are laboratory results from specific concentrate samples; they do not represent the average grade, mineral resource or reserve of the licence area.
Group IV Metallic Mining Exploration Licence, MAPEG dated 09.07.2021, valid until 09.07.2028. Licence transfer is subject to MAPEG regulatory approval and follows the procedure defined in the current mining regulations.
Briefing report, microscopic + petrographic analyses, XRF reports, coordinate-based maps, and 3D geological modelling data — all delivered in organised form. (Note: JORC/NI 43-101 resource model to follow completion of Phase-1 drilling.)
| Process | Status | Detail |
|---|---|---|
| Exploration Licence | ✓ Active | No: 202100781 · 09.07.2021 – 09.07.2028 |
| EIA | ~ In Process | Süreç koordineli yürütülmektedir |
| GSM Permit | ~ In Process | Süreç koordineli yürütülmektedir |
| Pasture Permit | ~ In Process | Süreç koordineli yürütülmektedir |
| Drilling Programme | ✓ Ready | 3.000 m (20 × 150 m) Faz-1 hazır |
| Resource Estimate | ○ Phase 2 | Sondaj tamamlanması sonrasında |
| Mining Licence | ○ Phase 2 | Kaynak tahmini ve fizibilite sonrasında |
Mining licence and economic viability assessment will be conducted following the completion of the drilling programme, independent technical review, and feasibility study.
During the exploration phase, the applicability of flotation and gravity separation techniques on collected samples is being evaluated. The values below are indicative, based on preliminary tests, and will be refined through detailed metallurgical work following completion of drilling.
A pilot-scale test programme with standard xanthate/dithiophosphate collector systems is planned for the complex sulphide mineralisation.
Knelson/spiral concentrator application is under consideration for free gold particles; may serve as primary beneficiation.
| METAL | HEDEF PROSES | BEKLENEN RECOVERY | DURUM |
|---|---|---|---|
| Au (Altın) | Gravite + Flotasyon | 75 – 90 % | PLANLANAN |
| Ag (Gümüş) | Flotasyon | 65 – 85 % | PLANLANAN |
| Cu (Bakır) | Flotasyon (ksantat) | 80 – 92 % | PLANLANAN |
| Pt / Pd (PGM) | Flotasyon + hidrometalurji | değerlendirmede | ÖN ÇALIŞMA |
| Ir (İridyum) | Hidrometalurji | değerlendirmede | ÖN ÇALIŞMA |
| Ti (Titanyum) | Manyetik ayırma + flotasyon | değerlendirmede | ÖN ÇALIŞMA |
Recovery aralıkları benzer mineralojik yapıdaki sahalar için literatür beklentileridir. Kesin değerler; besleme numunesi, laboratuvar, yöntem, test tarihi ve rapor no ile birlikte pilot metalurjik testlerin ardından yayınlanacaktır (QA/QC ve tekrar edilebilirlik ilkelerine uygun).
Final recovery figures will be reported after detailed metallurgical testwork is completed. This section constitutes an input for the buyer's own metallurgical due diligence.
The calculator below shows a THEORETICAL gross in-situ metal value based on the INPUT assumptions. It is NOT a resource estimate, feasibility assessment or investment advice.
For educational and comparison purposes only. Actual project economics are subject to operating costs, capital expenditure (CAPEX), taxes/royalties, exchange rates, discount rate and actual recovery factors.
⚠ NOTICE: This calculator is a research metric indicator (RMI). It cannot be interpreted as a JORC/NI 43-101 resource/reserve statement. Results are based on the grade × tonnage × recovery × price formula; operating costs are not deducted.
Sahanın şematik jeoloji ve alterasyon dağılım kesiti. Yüzey topografyasından derinlere doğru propilitik → serisitik → cevher zonu geçişi.
Şematik gösterimdir. Kesin jeolojik model detay sondaj programı sonrasında oluşturulacaktır.
Planlanan 20 × 150 m sondaj programının şematik grid görünümü. Sürüklemek için fareyi kullanın.
Şematik gösterimdir; kesin sondaj lokasyonları jeolojik-jeofiziksel etüt bulgularına göre optimize edilecektir.
Planlanan sondajlar için koordinat, azimut, eğim ve derinlik bilgileri. Kesin lokasyonlar jeofizik (IP-Rezistivite) sonuçları sonrası final revizyonuyla oluşturulacaktır.
| HOLE ID | Northing (m) | Easting (m) | Azimut (°) | Eğim (°) | Hedef (m) | Hedef Yapı |
|---|---|---|---|---|---|---|
| DDH-01 | 4,447,200 | 418,600 | 45 | -70 | 150 | Cevher zonu · Damar sistemi |
| DDH-02 | 4,447,350 | 418,600 | 45 | -60 | 150 | Alterasyon merkez |
| DDH-03 | 4,447,500 | 418,600 | 45 | -70 | 150 | Fay zonu · Kontakt |
| DDH-04 | 4,447,650 | 418,600 | 45 | -60 | 150 | Manyetik anomali |
| DDH-05 | 4,447,800 | 418,600 | 45 | -70 | 150 | Damar uzantı |
| DDH-06 | 4,447,200 | 418,800 | 45 | -60 | 150 | Cevher zonu · Damar sistemi |
| DDH-07 | 4,447,350 | 418,800 | 45 | -70 | 150 | Alterasyon merkez |
| DDH-08 | 4,447,500 | 418,800 | 45 | -60 | 150 | Fay zonu · Kontakt |
| DDH-09 | 4,447,650 | 418,800 | 45 | -70 | 150 | Manyetik anomali |
| DDH-10 | 4,447,800 | 418,800 | 45 | -60 | 150 | Damar uzantı |
| DDH-11 | 4,447,200 | 418,1000 | 225 | -70 | 150 | Cevher zonu · Damar sistemi |
| DDH-12 | 4,447,350 | 418,1000 | 225 | -60 | 150 | Alterasyon merkez |
| DDH-13 | 4,447,500 | 418,1000 | 225 | -70 | 150 | Fay zonu · Kontakt |
| DDH-14 | 4,447,650 | 418,1000 | 225 | -60 | 150 | Manyetik anomali |
| DDH-15 | 4,447,800 | 418,1000 | 225 | -70 | 150 | Damar uzantı |
| DDH-16 | 4,447,200 | 418,1200 | 225 | -60 | 150 | Cevher zonu · Damar sistemi |
| DDH-17 | 4,447,350 | 418,1200 | 225 | -70 | 150 | Alterasyon merkez |
| DDH-18 | 4,447,500 | 418,1200 | 225 | -60 | 150 | Fay zonu · Kontakt |
| DDH-19 | 4,447,650 | 418,1200 | 225 | -70 | 150 | Manyetik anomali |
| DDH-20 | 4,447,800 | 418,1200 | 225 | -60 | 150 | Damar uzantı |
| TOPLAM | 3.000 m | 20 hole × 150 m | ||||
Koordinatlar ITRF96 / UTM Zone 37N (EPSG:5254) referansında gösterge amaçlıdır. Final koordinatlar sondaj başlangıcından önce jeodezik lokasyon çalışmasıyla saha üzerinde işaretlenecektir.
The investor's corporate profile, technical capacity and financial standing are pre-qualified. Preliminary meeting with management follows a non-binding statement of intent.
A mutual Non-Disclosure Agreement (NDA) is executed. The NDA grants no exclusivity, no right of first refusal / offer (ROFR/ROFO) and no priority whatsoever — Sırataş Madencilik reserves the right to negotiate with multiple buyers in parallel.
Controlled access to the digital data room: 67-page briefing report, TÜRKAK-accredited analysis results, geology maps, licence documentation, coordinates, sample records and metallurgical testwork.
The buyer's own geologists, engineers or independent advisors conduct on-site technical review at Sivas Suşehri, in-situ evaluation of mineralised zones and additional sampling if required.
Following technical review, a Non-Binding Indicative Offer (NBO) is submitted. Under a competitive bid process, NBOs from multiple qualified investors are evaluated and a short list is established.
Final legal/financial/technical due diligence with the short-listed investor, execution of the Binding Offer and notary-approved transfer agreement, followed by MAPEG (General Directorate of Mining and Petroleum Affairs) licence transfer and delivery of all documentation.
This roadmap outlines the recommended stages for independent verification of the geological target in the current briefing report and for a systematic uplift of the licence value. Each stage increases the buyer's technical confidence and the achievable offer band.
High-resolution magnetic anomaly map — geophysical baseline for prioritising drill targets.
Detection of sub-surface sulphide / vein zones; optimisation of drill targets.
Diamond drilling at priority targets — multi-element ICP + Au fire assay at an independent accredited lab with QA/QC.
3D geological model from core logs, block modelling and first Mineral Resource estimate (Indicated / Inferred).
Resource statement signed by an independent Competent Person (CP) — prerequisite for corporate buyers and international financing.
Additional 1,000 m of drilling to upgrade resource category + Preliminary Economic Assessment (PEA/PFS).
The bands below are benchmarked against Turkish and global mid-tier Au/Cu licence transactions; any final price commitment will be assessed by Sırataş Madencilik at the end of the process.
Technical dossier value based on the report, laboratory results and strategic neighbourhood.
The band widens if 1,500–2,000 m of initial drilling at an independent accredited lab returns meaningful intersections.
Valuation will be reassessed following an independent resource statement, subject to the resulting tonnage, grade, classification and applicable reporting standard (UMREK/JORC).
We prioritize serious investor inquiries — response within 24 hours
This document is only available to invited parties. If a proposal has been sent to you, please enter the access code provided in that e-mail.